Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 11, 2023

No Information to Display

Multiple Locations

Demolition, New Construction, Site Work

No Information to Display

$10,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Mesa, AZ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

C10120 Fire Station 205 Rebuild The purpose of this project is to rebuild an existing fire station. The scope of the project may include: 1. Accommodations for multiple fire department crews; 2. Up to four (4) pull-through bays; 3. Secured site and parking lot; 4. Public parking lot; 5. Temporary station; 6. Alternate locations; 7. On-site, Off-site and Utility Improvements; 8. Other miscellaneous improvements at all Sites, as determined and deemed necessary with the Project design and development The estimated construction cost is $8,000,000 - $10,000,000 The City anticipates commencing construction in late 2024 C10124 Fire Station 223 The purpose of this project is to construct a new fire station. The scope of the project may include: 1. Accommodations for multiple fire department crews; 2. Up to four (4) pull-through bays; 3. Secured site and parking lot; 4. Public parking lot; 5. On-site, Off-site and Utility Improvements; 6. Other miscellaneous improvements at the Site, as needed The estimated construction cost is $8,000,000 - $10,000,000 The City anticipates commencing construction in mid 2024 C10128 Fire Station 224 The purpose of this project is to construct a new fire station. The scope of the project may include: 1. Accommodations for multiple fire department crews; 2. Up to four (4) pull-through bays; 3. Secured site and parking lot; 4. Public parking lot; 5. On-site, Off-site and Utility Improvements; 6. Other miscellaneous improvements at the Site, as needed. The estimated construction cost is $8,000,000 - $10,000,000 The City anticipates commencing construction in mid 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.