Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 9, 2023

January 1, 2024

No Information to Display

525 S Park Blvd

New Construction, Paving, Site Work

No Information to Display

$925,000.00

Public - County

img_map_placeholder

525 S Park Blvd, Glen Ellyn, IL

Subscribe to View Full Documents

*As of October 25, 2023, bid results are still Under Evaluation. Forest Preserve District of DuPage County, Illinois is accepting sealed bids for: Willowbrook Wildlife Center Phase 'B,' construction of a 27,500 sq.ft. clinic/visitor center. Such proposals as herein concerned shall be for the following as described: BID GROUP NO. 3 BID PACKAGES #11 - #32: Bid Package #11 - Concrete Bid Package #12 - Masonry Bid Package #13 - Structural Steel Bid Package #14 - Casework Bid Package #15 - General Trades Bid Package #16 - Heavy Timbers Bid Package #17 - Waterproofing Bid Package #18 - Aluminum Framed Openings & Glazing Bid Package #19 - Acoustical Ceilings Bid Package #20 - Flooring Bid Package #21 - Painting Bid Package #22 - Walk-in Coolers and Freezers Bid Package #23 - Elevators Bid Package #24 - Fire Suppression Bid Package #25 - Plumbing Bid Package #26 - HVAC Bid Package #27 - Electrical Bid Package #28 - Earthwork Bid Package #29 - HMA Pavement Bid Package #30 - Landscaping Bid Package #31 - Site Utilities Bid Package #32 - Roofing As an example: Bid Group 3- Bid Package #11 Concrete. Please complete the Required Bid Submittal Checklist Form, it is attached to this document. This advance registration is required for your bid to be recognized as compliant and to ensure all relevant and up-to-date information is received. Pre-qualification of all bidders in this bid group is required prior to the bid due date. Submit one fully executed copy of AIA Document A305 "Contractor's Qualification Statement" prior to submitting this bid form unless we have one on file. Please email to Jeaneen Turner- jturner@wightco.com. In addition to supplying this form, each trade Contractor is also required to answer the following questions and provide these answers with your AIA Document A305: 1) List of trade union agreements and date the current agreement expires. 2) Within the last seven years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract (if the answer is yes, please attach the details.) 3) On a separate sheet, list the major projects your organization has completed in the past five years giving the name of project, owner, architect, contract amount, date of completion and percentage of the cost of the work performed with your own forces 4) Trade/Supplier References (minimum of 3): The competency and responsibility of the bidders will be considered in making awards. The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid. Bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. Bid security in the form of a Bid Bond, certified check or cashier's check made payable to Forest Preserve District of DuPage County in an amount equal to not less than ten percent (10%) of the Base Bid shall be submitted with the Bid. Bid security is required of all parties submitting a proposal. A fully executed and compliant Bid Security must be included with the Bid Form. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The Construction Manager for this project is Wight Construction Services, Inc. All questions concerning this project or those concerning bidding requirements should be directed to George Gardner email address: ggardner@wightco.com Questions must be received in writing, or via email (ggardner@wightco. com), until 12:00 PM. Thursday, February 2nd, 2023. The Forest Preserve District reserves the right to reject any or all bids, to negotiate contract terms with various Bidders, and to waive all formalities or irregularities to any bid when such is deemed by the Owner to be in the Owner's best interests.

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects