Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 16, 2023

June 21, 2023

September 1, 2023

2740 Avenue St David

Renovation

No Information to Display

$1,145,900.00

Public - State/Provincial

img_map_placeholder

2740 Avenue St David, Quebec, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1680982 Deadline for receipt of complaints: 2023-01-30 Redo the Ceramic Tiles in the Entrance, Lockers and Cafeteria at Samuel-de Champlain Secondary School. The estimated value of the project is between $1,000,000 and $1,400,000. Brief description of the work: Work preparations: the mandatary company will have a specific intervention plan to submit to the school service center before mobilizing. - Moving fixed/mobile furniture (lockers, tables, chairs, benches, others => storage in adjacent corridors or premises dedicated by the school) - Dismantling and disposing of existing metal lockers according to the location plan concerned. - Installation of protections (Polythene type on walls, ceilings, free passages, doors, others without limitations + installation of fans to create negative pressure with extraction of stale air to the outside) - Ceramic demolition + Screed - Ceramic demolition of walls bathroom vestibules - Demolition of expansion joints - Demolition of floor drain - Demolition of foot scraper grids - Installation of new floor drains - Installation of new expansion joints - Installation of transition profiles where necessary - Installation of new ceramic walls of WC vestibules - Installation of new ceramic including new screed - Supply and installation new foot scraper grids including sealed frame - Refitting of furniture and coordination of the subcontractor who will supply and install the new lockers - Repainting in areas damaged by the works, in areas requiring it following the movement of fixed, removable and at the installation of new lockers - End of site cleaning *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects