Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 7, 2023

April 10, 2023

October 6, 2023

Warehouse St

Paving, Site Work

No Information to Display

$1,238,306.00

Public - City

img_map_placeholder

Warehouse St, Bennington, NE

Subscribe to View Full Documents

Est. Completion Date: Oct. 6, 2023 Description: Removal and replacement of 3,000 SY of concrete paving, 750 SY of concrete driveway, and building 3,800 SF of new concrete sidewalk. Construction of 700 LF of 18" RCP storm sewer with 10 inlets and corresponding laterals. Cured-in-place existing sanitary sewers of 1,500 LF and rehabilitate existing sanitary sewer manholes of 63 VF. Contract type: One Contract for construction of ALL Groups, Group A, B, and C and all such alternates as Owner may select, based on what Owner believes to be in the best interest of Owner and the funds available for the work The work shall consist of the mobilization and demobilization of Contractor's forces and equipment necessary for performing the work required under the contract. B. This work shall not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. C. Mobilization shall not be considered as work in fulfilling the contract requirement for commencement of work. D. The work shall consist of providing all required contract bonding and insurance required under the contract. The work is generally described as follows: Removal and replacement of 3,000 SY of concrete paving, 750 SY of concrete driveway, and building 3,800 SF of new concrete sidewalk. Construction of 700 LF of 18" RCP storm sewer with 10 inlets and corresponding laterals. Cured-in-place existing sanitary sewers of 1,500 LF and rehabilitate existing sanitary sewer manholes of 63 VF

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects