Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 7, 2023

October 27, 2023

Rue Notre Dame O

Paving, Site Work

No Information to Display

$5,000,000.00

Public - City

img_map_placeholder

Rue Notre Dame O, Trois-Rivieres, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The corridor project for oversized transport on rue Notre-Dame at the port of Trois-Rivieres consists of redeveloping rue Notre-Dame over a section of +-900m so that it is capable of allowing the passage of low-loader trucks of non-standard transport while respecting specific load parameters and specific templates to meet the operational needs of the APTR. The work required to redevelop Notre-Dame Street consists of widening the street to allow non-standard traffic and redoing its infrastructure to meet the required load criteria. The work to be carried out mainly involves the replacement of underground networks (storm sewers and aqueduct), civil engineering work, reconstruction of roadways, sidewalks and curbs, the construction of concrete blocks for the burial of aerial networks hindering non-standard traffic, as well as the construction of a new access road to the port of Trois-Rivieres including a new gatehouse, security fences, a barrier access, power supply and others. TIMELINE: Request for proposals for engineering services to complete design and monitor construction work is closed. Reference number: 1680227. 30% of design is to be completed by March 29, 2023. 60% of design is to be completed by April 19, 2023. 100% of design is to be completed by May 10, 2023. Tender for general contractor process is scheduled to start on May 12, 2023. Further update in March, 2023.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects