Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 16, 2023

July 5, 2023

August 9, 2024

200 120th St SW

Addition, Demolition, Renovation, Site Work

No Information to Display

$1,596,030.00

Public - County

img_map_placeholder

200 120th St SW, Everett, WA

Subscribe to View Full Documents

Mariner High School Renovation and Addition - Multiple Bid Packages BP-02.1 STRUCTURAL AND SELECT DEMOLITION $686,429. BP-06.1 CASEWORK AND FINISH CARPENTRY $594,312 BP-09.2 PAINTING AND COATINGS $152,629 BP-09.3 CARPETING $81,771. BP-09.4 RESILIENT FLOORING AND ACCESSORIES $67,116 BP-11.1 FOOD SERVICE EQUIPMENT $72,473 BP-21.1 FIRE SPRINKLERS $222,207 BP-31.1** EARTHWORK AND UTILITIES $1,974,734 BP-32.1 LANDSCAPING AND IRRIGATION BP-32.2 ARTIFICIAL FIELD TURF BONDS: For all bids equal to or exceeding $300,000 a Performance and Payment Bond will be required. Bidders are to ensure that the cost of this bond is included in their base bid amount. A bid bond in the amount of 5% of the total bid amount is required for all bids that equal or exceed $300,000. TRADE UNIONS: Spee West Construction Co. has an agreement with the Pacific Northwest Regional Council of Carpenters. Trade Contractors shall be bound and obligated to such agreements for work claimed by the Carpenters Union per RCW 39.10.380 Subcontract Bidding Procedure. If Trade Contractor and lower tier subcontractors will be performing work claimed by the Carpenters Union, and are not signatory with the Union, they (Trade Contractor and lower tier subcontractors) will enter into an agreement with the Carpenters Union for performance of the claimed work on this project. BIDDING NOTE: Spee West Construction Co. is acting as GC/CM for the Mukilteo School District for this project. Spee West is not the general contractor for this project. For this reason, all rules for public bidding must be followed by all Trade Contractors bidding on these bid packages. Bids for bid packages must be submitted in accordance with the Instructions to Bidders. All bids shall remain valid for a period of 90 calendar days. Bid Results GWB and Acoustical Assemblies G K Knutson Inc - $1172000 Landscaping and Irrigation Total Ground - $424030

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.