Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 30, 2023

March 1, 2024

November 30, 2024

317 Knutson Dr

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

317 Knutson Dr, Madison, WI

Subscribe to View Full Documents

** As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information. For Storm Sewer Repairs All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changestake effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page electronically In general the work consists of: repairs to storm sewer collection system including pipe cleaning of approximately 4,000 linear feet of storm sewer ranging in size from 8-inch to 30-inch; removal and replacement of 15 curb inlet structures; resetting of offset manhole frames; installation of 6 new storm manholes; removal and replacement of 1 storm manhole; relay of approximately 250 linear feet of 12-inch storm sewer; installation of approximately 40 feet of new 15-inch storm sewer; spot repair of 5 defects in existing storm sewer; cured-in-place-pipe (CIPP) lining of approximately 300 feet of 15-inch storm sewer; and surface restoration including turf grass, concrete sidewalk,43 concrete curb and getter, and asphalt pavement Project Has been rebid The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply.These changes take effect for projects advertised for bid after September 23, 2017. This change does not3 affect the Federal Davis Bacon Act requirements.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.