Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 31, 2023

July 1, 2023

December 31, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$2,387,852.00

Public - City

img_map_placeholder

Multiple Locations, Val Marie, SK

Subscribe to View Full Documents

CONSTRUCTION OF A SINGLE SPAN - 21.0-METRE-LONG X 8.53-METRE-WIDE PRECAST CONCRETE AND STEEL, Olson Bridge over the Frenchman River in NE 09-03-13 West of the 3rd Meridian in the RM of Val Marie No.017, approximately 5 km south of Val Marie, Saskatchewan. -AND- CONSTRUCTION OF A THREE SPAN - 30.0-METRE-LONG X 8.53-METRE-WIDE PRECAST CONCRETE AND STEEL BRIDGE, Jensen Bridge over the Frenchman River in SW 30-05-15 West of the 3rd Meridian in the RM of Val Marie No.017, approximately 36 km west of Val Marie, Saskatchewan (or 18 km northeast of Climax). The Bid withdrawal shall be submitted with the subject line "RM017-2022-001 WITHDRAWAL" and shall be in PDF format. The Bid modification or correction shall be submitted with the subject line "RM017-2022-001 CHANGE" and shall be in PDF format. In the event of multiple notices of modification or correction, all notices shall be applied to the previously modified Unit Price for the purpose of calculating the new modified Unit Price. Unless withdrawn in accordance with the instructions provided, Bids are irrevocable for 60 days after the close of bidding. INQUIRIES Bidders shall submit all inquiries pertaining to the Bid Package documents a minimum of 2 business days prior to close of bidding directed to: SKBridgeBids@wsp.com. Material substitutions and/or proposed equivalents will only be considered after the award of the Proposed Work. NO SOLICITATION The RM of Val Marie No. 17 and WSP Canada Inc. shall not consider or respond to any unsolicited offers, alternatives, or inquiries not directly related to bidding on the Proposed Work

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.