Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 20, 2023

July 20, 2023

July 19, 2028

To Be Determined

Service, Maintenance and Supply

No Information to Display

$99,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Arnold Air Force Base, TN

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Contract Award Date: Aug 15, 2023 Contract Award Number: FA9101-23-D-B009 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: DN7UQLDB21F5 Contractor Awarded Name: BACIK GROUP LLC Contractor Awarded Address: Pelham, AL 35124 USA Base and All Options Value (Total Contract Value): $99,000,000.00 1. This is a request for proposal (RFP) for the Civil Engineering Building and Utilities Mechanical III (CE BUMP III) effort at Arnold AFB. This requirement is being solicited as competitive 100% small business set-aside, utilizing a subjective tradeoff based upon an integrated assessment of Past Performance and Price. The CE BUMP III effort is a follow-on acquisition, which includes mechanical installation, minor construction, infrastructure sustainment, maintenance and repair of heating ventilation and air conditioning (HVAC) systems, water systems (raw, potable, industrial, fire protection), steam systems, and fuel systems projects at Arnold Air Force Base (AFB), TN. These projects include the sustainment, restoration and modernization (SRM) of existing capabilities (compatibility with current control systems are the only restriction) to support the research development test and evaluation (RDT and E) mission at Arnold AFB. 2. The period of performance (PoP) for the CE BUMP III acquisition is five years from award. 3. This contract will be firm-fixed-price (FFP). 4. The Government intends to award a minimum of two and up to four basic contracts. 5. The maximum dollar amount over the life of the contract is $99M. The guaranteed minimum amount over the life of the contract will be $1K. 6. Projects under the resulting contract will be issued in the form of Task Orders. 7. The Seed Project Task Order disclosure of magnitude (Ref: FAR 36.204) is between $250K and $500K. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects