Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 17, 2023

April 17, 2023

October 14, 2023

9700 Old Harford Rd

Demolition, Site Work

No Information to Display

$559,826.00

Public - State/Provincial

img_map_placeholder

9700 Old Harford Rd, Parkville, MD

Subscribe to View Full Documents

VSBE Participation (%) 4.0 MBE Participation (%) 20.0 The work shall be completed within 180 calendar days from the start date of the contract. If the work is not completed within the time period specified, the contractor will be liable for liquidated damages of $350.00 per calendar day as specified in the "General Conditions." The deadline for questions shall be Tuesday, February 7, 2023 at 2 pm. to ensure that there is enough time to allow for the A/E to provide responses and possible Addendum issuance if necessary. The PROJECT CLASSIFICATION for this solicitation is: "D" ($1000,000 to $2,500,000) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The successful contractor shall provide all labor, equipment, tools, materials, supplies, etc. required as described within the documents for the demolition of Buildings 10 - 13, 17, 18, and 21 at the Charles H. Hickey, Jr. School, 9700 Old Harford Road, Parkville, MD 21234. Demolition shall include the material handling, removal, and disposal (including of any hazardous materials), and recycling of demolished materials. The Contractor is strongly urged to visit the site and familiarize themselves with the conditions under which the work will be performed. No allowance will be made for any errors on the Contractor's part for failure to take into account any conditions or circumstances existing on the site which may affect the contemplated work. All measurement are estimates and the contractor is responsible for taking their own. The fact that a bid is submitted will be taken as evidence that the Contractor has a full knowledge of the extent and character of the work and the problems in performing it.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects