Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 1, 2023

April 17, 2023

September 29, 2023

W Marginal Way SW

Paving, Site Work

No Information to Display

$4,418,049.00

Public - City

img_map_placeholder

W Marginal Way SW, Seattle, WA

Subscribe to View Full Documents

As of February 23, 2023, this project was awarded to Gary Merlino Construction Company Inc., awarded amount is $4,418,048.75. Industrial District West, W Marginal Way SW from Chelan Ave SW to SW Marginal Pl This project includes the following: pavement reconstruction, curb ramps, sidewalk,shareduse trail, traffic signal installation and modifications, drainage improvements, grading, utility adjustments, and fire hydrant removal and installation. For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of Î9 Percent WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. There is no pre-bid site inspection meeting scheduled for this project. This project is funded by the Move Seattle levy, a 9-year program to improve safety, maintain assets and provide affordable travel options. The Move Seattle program has a 23% utilization WMBE) goal. This goal doesnt replace the WM BE! past performance assigned to this contract. Question Deadline 01/20/2023 at 5:00 PM PT Questions must be emailed. All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid open - Tap to join from a mobile device (attendees only) +1-206-207-1700,1461088903## United States Toll (Seattle) +1-408-418-9388,1461088903## United States Toll Join by phone +1-206-207-1700 United States Toll (Seattle) +1-408-418-9388 United States Toll Global call-in numbers Join from a video system or application Dial 1461088903@seattle.webex.com You can also dial 173.243.2.68 and enter your meeting number. Join using Microsoft Lync or Microsoft Skype for Business Dial 1461088903.seattle@lync.webex.com TRC0500-U1388 CLARIFICATION DEADLINE 1/27/2023 5:00 PM

58 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.