Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 7, 2023
January 15, 2024
October 9, 2026
Multiple Locations
Renovation
No Information to Display
$150,000,000.00
Public - State/Provincial
Multiple Locations, Emigration Canyon, UT
The initial contract will be for services provided during the design phase. Once a final scope of services is identified for the construction phase for commissioning, a change order will be negotiated for these services. If an acceptable fee cannot be negotiated, another SFC for commissioning services will be issued for the construction period. There is no representation or assurance that the entity awarded the services for the design phase will be issued a contract for the construction phase. Phase II also includes a proposed daycare and office space with the intent of replacing several services currently offered on the site with buildings that better suit student and staff needs. Unit mixes have been based off the Phase I and modified to meet proforma needs of the UU. The intent is that Building C2 be permitted first with substantial completion of July 2025, along with the CUP and the other two buildings complete in late Dec 2025 through a design/build process for the project. Bldg C2-153,763 SF Height 55\'6 ft-Type VA. The Daycare Bldg, Type 5B, 7265 SF 24.7ft high, and will be substantially complete in Dec 2025. E Bldg is 223,469 SF, Type 1A below the podium, Type 3B above the podium and 74ft in height. CUP is type VB, 2oft high and 1686 SF. R2 occupancy for Bldg C and E, Daycare is 1-4, CUP is occupancy U. Total sf is 385,000 and construction costs are $150,000,000.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
West Jordan, UT
Bid Date: Aug 25 2023
Tooele, UT
Bid Date: Aug 22 2023
Kamas, UT
Bid Date: Aug 29 2023
Salt Lake City, UT
Bid Date: Sep 29 2023
Bountiful, UT
Bid Date: Aug 24 2023
Logan, UT
Bid Date: Sep 07 2023
Layton, UT
Bid Date: Jun 09 2023
Murray, UT
Bid Date: Aug 29 2023
Salt Lake City, UT
Bid Date: Jul 20 2023
South Jordan, UT
--
Richfield, UT
Bid Date: Aug 31 2023
Tooele, UT
Bid Date: Jul 07 2023
Pleasant Grove, UT
Bid Date: Sep 12 2023
Salt Lake City, UT
Bid Date: Aug 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
