Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 31, 2023

April 3, 2023

July 1, 2024

5800 N Tryon St

New Construction, Paving, Site Work

No Information to Display

$10,749,900.00

Public - City

img_map_placeholder

5800 N Tryon St, Charlotte, NC

Subscribe to View Full Documents

Wood Project No. 6234-21-0190 Take the elevator or stairs to the 2nd floor, follow the directions for "City Procurement" to arrive at Room # 200A. The pink color bid box is located across from Room # 200A. The City of Charlotte reserves the right to reject any and all bids and to waive any informalities or technicalities as it may deem to be in its best interest. Project consists of construction of a new 2-story Firehouse in the Hidden Valley community for the Charlotte Fire Department (CFD) located at 5800 North Tryon Street, Charlotte, NC 28262. The work of the project is defined by the Contract Documents and consists of the followings: 1. The Work includes a concrete slab on grade, elevated concrete composite slab, reinforced concrete masonry unit walls, structural steel, and metal deck roof framing. The exterior consists of modular brick veneer, prefinished aluminum metal panel systems and storefront window systems. 2. New exterior construction work will consist of low masonry walls, masonry screen walls, landscaping, sidewalks, new parking lots, stormwater control measure, new dumpster enclosure and fencing. 3. The project also includes fire sprinkler system, geothermal, and photovoltaic panels. 4. Interior finishes include a combination of gypsum wallboard on metal studs or furring channels and painted block walls. Acoustical and gypsum board ceilings. Floors finishes include integral color concrete, tile, carpet, porcelain tile, luxury vinyl tile, and rubber flooring. 5. Special coordination will be required with the owner's security vendor, A/V vendor, and furniture vendor. This project is subject to the requirements of the City's Charlotte Business INClusion (CBI) Program topromote diversity, inclusion, and local business opportunities in the City's contracting and procurementprocess for Minority, Women, and Small Business Enterprises headquartered in the Charlotte CombinedStatistical Area.CBI Goal: The following Subcontracting Goals have been established for this project:MBE = 8.00%SBE = 13.00%Questions relating to the CBI Program should be addressed in writing to:Joshua Burrus, Compliance SpecialistEmail: Joshua.Burrus@charlottenc.gov Bidders must be properly licensed under North Carolina state law to perform the work. A 5% bid security is required with each bid that equals or exceeds $300,000

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.