Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 14, 2023

June 1, 2023

December 15, 2024

200 NeoCity Wy

Addition, Demolition, Renovation, Site Work

No Information to Display

$23,000,000.00

Public - County

img_map_placeholder

200 NeoCity Wy, Kissimmee, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of August 18, 2023, an architect and construction manager have been selected for the project. The project has started construction. *The closed solicitation has been included below for reference: The Center for Neovation, an Advanced Manufacturing Semiconductor Fabrication Lab located at 200 NeoCity Way, NeoCity, FL 34744, is renovating, upgrading, facilitating and installing process equipment within the remaining open areas of the existing facility and requires proposals for the design and construction management of the modifications. This project will be partially funded with Federal funds from the United State Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with that program. 1. The purpose of this Scope of Services is to obtain proposals from qualified Construction Managers at Risk (CMAR) for the modification and renovation of the facility and infrastructure to support such. Infrastructure Improvements scope will include, expanding and upgrading cleanroom space for Advanced Packaging Processing including modifications and expansion of the existing filtration, HVAC, and exhaust systems, increasing of the Ultra-Pure Water Treatment plant capacity, expansion and modification of the distribution of the existing Ultra Clean Process Services, chemical distribution and collection services and systems, and the required electrical service modifications and additions, to support the expansion, including improving Emergency Backup Power Capabilities (UPS) for Semiconductor Tools, Equipment and Machinery. 2. The Construction Management firm will participate in the design, permitting and post-design services, supplying assistance during the design process to resolve constructability issues and ensuring the project remains on budget and schedule. Question End Date 1/6/2023 12:00 PM Insurance Required Yes Bid Bond Required Yes Performance Bond Required Yes MBE (15.5%), WBE (6.9%) Shortlist Confirmed. As per Ted Phillips "An award has not yet been completed but is anticipated by the end of this month." (As of 08/10/2023)

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.