Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 1, 2024

September 30, 2025

US-64

Paving, Site Work

No Information to Display

$2,500,000,000.00

Public - State/Provincial

img_map_placeholder

US-64, Whiteville, TN

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Corridor K in Polk County is primarily a two-lane road with 12-foot travel lanes and variable shoulder widths through the Ocoee River Gorge. Several build options have been evaluated to improve the route including relocation, spot improvements, and tunnel options. Due to environmental and financial constraints, TDOT is looking at a targeted approach for spot improvements. Multiple sites, or spots, have been identified for improvement along the corridor. Proposed projects include roadway improvements and rockfall mitigation. All design options being considered for the identified sites are noted below. Additionally, a bridge-and-tunnel option is being considered on the south end of the project area. This option would consist of two long-span bridges and two twin-bore, single-lane tunnels. The total span length of the two bridges would be 1,430 feet with cast-in-place concrete or steel components. The total length of the two tunnels would be 2,200 feet (0.42 miles) for Tunnel No. 1 and 1,100 feet (0.21 miles) for Tunnel No. 2. The bridges would be connected by Tunnel No. 2. As of August 22, 2023, the design firm has been selected. The construction document completion timeline has not been released. A tentative bid schedule for contractors has not been disclosed. Four locations along the corridor are scheduled for construction in fiscal year 2025 (October 1, 2024-September 30, 2025)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.