Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 17, 2023

June 30, 2024

360 Crane Ave

Site Work

No Information to Display

$230,000.00

Public - City

img_map_placeholder

360 Crane Ave, Saint Helena, CA

Subscribe to View Full Documents

Question Deadline 10/09/2023 at 1:00 PM PT The City reserves the right to cancel or modify, for any or no reason, in part or in its entirety, this RFQ including, but not limited to, selection schedule, submittal date, and submittal requirements, without prior notice. Notification of revisions to the RFQ will be made by addendum posted on the bid webpage. Applicable California State Contractors License Board (CSLB) contractor license number and type of licenses held. Pursuant to California Civil Code Section 9550 et seq, any successful bidder for cumulative work in excess of $25,000 shall furnish to the City at the time of execution of the contract a payment bond approved by the City in an amount equal to one hundred percent (100%) of the contract price. The successful bidder for cumulative work in excess of $25,000 shall also furnish to the City at the time of execution of the contract a faithful performance bond approved by the City in an amount equal to one hundred percent (100%) of the contract price The Vendor shall prepare three design alternatives and present the designs to the PRC. Upon design selection, the Vendor shall coordinate and be responsible for the demolition, removal and disposal of the existing playground facilities, and procurement and installation of the new play equipment. All elements required for the selection and installation of the new playground equipment shall be within the designated budget. Installation of the new playground completed must be completed by June 30, 2024.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects