Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2023

February 15, 2023

April 30, 2023

1929 Grimball Rd

Paving, Site Work

No Information to Display

$400,000.00

Public - County

img_map_placeholder

1929 Grimball Rd, Charleston, SC

Subscribe to View Full Documents

Septima Clark Academy Re-Surfacing & Re-Striping TMS # 334-07-00-049 Scope of work includes, but not limited to, mill or remove pavement and repave as shown on drawings. Install concrete dumpster pad and ADA ramp with detectable warning surface. Location- Septima Clark Academy 1929 Grimball Rd. Charleston, SC 29412 For more detail, contact smarlowe@cumming-group.com. A. Scope of work includes but is not limited to: mill or remove pavement as shown and repave as shown on drawings. Install concrete dumpster pad and ADA ramp with detectable warning surface. Install striping as shown in drawings. Relocate ADA parking (2) & Loading zone no parking signs as shown on drawings. Install (2) wheel stops as shown on drawings. Fencing dumpster enclosure will be installed by CCSD vendor. B. Contractor shall maintain the construction entrances. This shall include (but not necessarily be limited to) grading, filling of ruts and potholes, and maintaining proper drainage. Maintenance of entry gates shall also be the contractor's responsibility. Adjacent public streets, sidewalks, curbs, and parking lots shall be swept, scraped, washed and kept clean daily (more often as necessary) throughout all operations. The first day the contractor will have access to the site will February 15, 2023 and Substantial Completion by April 15, 2023. MBE (20%) QUESTIONS MUST BE RECEIVED BY: January 4, 2023 @ 12pm

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.