Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 12, 2023

February 27, 2023

October 3, 2023

PA-309

Paving, Site Work

No Information to Display

$1,341,000.00

Public - State/Provincial

img_map_placeholder

PA-309, Hanover Township, PA

Subscribe to View Full Documents

For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LACKAWANNA & LUZERNE COUNTIES, Scott Township, Blakely Borough and Salem & Wright Townships, Commonwealth of Pennsylvania, STATE ROUTE 0309, SECTION P57. The project being situated as follows: SR 0347 Sec P71 Segment 0144 Offset 3104 to Segment 0150 Offset 0368 in Lackawanna County SR 0347 Sec P72 Segment 0180 Offset 1427 to Segment 0180 Offset 2263 in Lackawanna County SR 0309 Sec P57 Segment 0380 Offset 1894 to Segment 0390 Offset 0472 in Luzerne County SR 4037 Sec P63 Station 176+00 to Station 183+10 in Luzerne County This Bridge Preservation project consists of the repairs of Two (2) bridges in Lackawanna County and Two (2) bridges in Luzerne County. Work includes (but is not limited to) excavation, asphalt paving, pavement markings, rock protection & structure backfill, guiderail repairs, partial bridge & culvert removal, concrete bridge repairs. Additional work includes Unforeseen Bridge Repairs, temporary traffic control and other miscellaneous work as indicated on the approved drawings included in the bid package. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 33.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge PennDOT -SR 309 Over Pine Run Bridge Preservation

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects