Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
July 1, 2024
June 20, 2026
To Be Determined
Demolition, New Construction, Outdoor Lighting, Paving, Renovation, Site Work
No Information to Display
$250,000,000.00
Public - Federal
To Be Determined, March Air Reserve Base, CA
Per the owner, as of October 19, 2023, they are likely going to delay the solicitation for this project until early in the calendar year of 2024. Information regarding a design team is not available. A firm timeline for construction has not been determined. .............. Pre-Proposal Conference (Industry Day) Time: 2:00 - 4:00 PM Pacific Standard Time (PST) - Informational Meeting The Pre-Proposal Conference informational presentation will be conducted on Thursday, 02 March 2023 at the following location: March Air Field Museum 22500 Van Buren Blvd, March Air Reserve Base, CA 92518 Website: https://www.marchfield.org Phone: 951-902-5949 Email: info@marchfield.org The Museum is located just south of downtown Riverside, on Van Buren Boulevard at Interstate 215 and adjacent to March Air Reserve Base. The cities of Moreno Valley and Perris are just to the north and to the south respectively. Please note that there are no RSVP requirements for access to this Industry Day as the venue is located off base and there are no special access requirements. Webex (Virtual Participation): https://usace1.webex.com/meet/elizabeth.m.hershner Call-in: 1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 129 5937 The Government is planning to issue a single construction contract solicitation for the construction of a KC-46 Two-Bay Maintenance/Fuel Cell Hangar. The Two-Bay Hangar project consists of one aircraft hangar (approximately 124,000sf) to simultaneously accommodate one KC-46A aircraft in each bay. The project also includes a renovation to the exterior and interior of Building 1244 (approximately 18,000 SF) by demolishing and/or installing all necessary walls and reconfiguring the interior layout for personnel spaces such as office space, briefing rooms, classrooms, communication rooms and restrooms/shower facilities. The purpose of this renovation to provide facility space for a Fuselage Training Simulator directly correlated to the KC-46 Two-Bay Hangar. Additionally, the project will involve new airfield pavement markings for the North and South ramps as well as mooring points on the south ramp. Associated support features include personnel support areas and storage areas for hazardous materials, tools, supplies and equipment. Hangar area will provide fire suppression and a fall protection system. Construction will also include, but is not limited to, all associated utilities, site work, communication support, parking areas, secure airfield fencing, exterior lighting, landscaping and ramp pavement transitions. Construction contract will also include the demolition of an existing hangar located on the site. Antiterrorism/Force Protection (AT/FP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Please note that this posting will be updated to include the Industry Day Presentation following the pre-proposal conference completion. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
March Air Reserve Base, CA
Bid Date: Sep 23 2024
March Air Reserve Base, CA
Bid Date: Sep 19 2024
March Air Reserve Base, CA
Bid Date: Aug 18 2023
March Air Reserve Base, CA
Bid Date: Jul 14 2023
Byron, CA
Bid Date: Oct 17 2023
Palo Alto, CA
Bid Date: Oct 17 2023
Martinez, CA
Bid Date: Oct 17 2023
Lancaster, CA
Bid Date: Jul 27 2023
Los Angeles, CA
--
Pasadena, CA
Bid Date: Oct 19 2023
Porterville, CA
Bid Date: Nov 06 2023
Los Angeles, CA
Bid Date: Oct 05 2023
East Los Angeles, CA
Bid Date: Oct 23 2023
Sacramento, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
