Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2023

February 10, 2023

July 13, 2024

311 NE 141st Ave

Addition, Demolition, Renovation, Site Work

No Information to Display

$7,785,888.00

Public - County

img_map_placeholder

311 NE 141st Ave, Alleman, IA

Subscribe to View Full Documents

The bids are for multiple Prime Contracts as indicated by DCI Group for the construction of the playground at Big Elementary School in Polk City, IA. Bids shall be on a lump sum basis; segregated sub-bids will not be accepted. Work is anticipated to commence upon award of contract, and be completed by July 13", 2024, as shown in the Contract Documents. A public hearing will be conducted at a meeting to be held at District Office Board Room at 13930 NE 6th Street, Alleman, IA 50007, at 6:00 p.m., local time, on December 19", 2022, at which time and place any person may appear and file objections to the proposed plans, specifications, form of contract, and the estimated cost of said project. Bid security in the amount of 10% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond is required for this project. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum. The award of the contract may be made by North Polk Community School District to any responsible bidder or bidders offering suitable supplies, equipment and/or service at the lowest price taking into consideration the quality of materials or service in the best interest of the Owner. The right is reserved to reject any and all bids, or any part thereof, and to waive informalities, and to enter into such contract or contracts as shall be deemed in the best interest of the Owner. Low Bids by Package: BP #1- General Construction DDVI $3,170,000.00 $3,265,000.00 BP #2 - Roofing Central States Roofing $439,000.00 $261,600.00 BP #3 - Glazing Mid-American Glazing $200,000.00 $369,000.00 BP #4 - Flooring Poindexter $121,000.00 $247,017.00 BP #5 - Framing, Ceiling, Drywall Performance Contracting Group $406,000.00 $424,000.00 BP #6- Lockers H2I $60,000.00 $84,396.00 BP #7 Fire Suppression VRBAN Fire Protection $75,000.00 $174,875.00 BP #8 - Mechanical/Plumbing Manning-Seivert $1,721,000.00 $1,880,000.00 BP #9 - Electrical & Low Voltage Van Maanen $1,170,000.00 $1,080,000.00 General Conditions $580,084.00 Total Budget vs. Bids: $7,942,084.00 $7,785,888.00 Bid result - BP #1- General Construction - DDVI - $3,265,000.00 BP #2 - Roofing - Central States Roofing - $261,600.00 BP #3 - Glazing - Mid-American Glazing - 369,000.00 BP #4 - Flooring - Poindexter - $247,017.00 BP #5 - Framing, Ceiling, Drywall - Performance Contracting Group - $424,000.00 BP #6- Lockers - H2I - $84,396.00 BP #7 Fire Suppression - VRBAN Fire Protection - $174,875.00 BP #8 - Mechanical/Plumbing - Manning-Seivert - $1,880,000.00 BP #9 - Electrical & Low Voltage - Van Maanen - $1,080,000.00

111 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects