Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2024

December 2, 2024

To Be Determined

Renovation

No Information to Display

$887,250.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Elkhorn, WI

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of August 21, 2023, an engineer has been selected and this project is in the design status. It is anticipated construction will start in May 2024 and end in December 2024. *The closed solicitation has been included below for reference: PROJECT REQUEST: Department of Military Affairs requests the release of $35,000 Building Trust Funds to prepare Design Report and Preliminary Design documents for the Elkhorn Readiness Center Replace Boiler and Update DDC project. PROJECT NUMBER: 22F1D PROJECT DESCRIPTION: This project will replace the existing steam boiler and piping converting the building to hot water heating by utilizing high efficiency condensing type boilers. This project also adds new building controls to monitor HVAC remotely. 1. Install 2 new high efficiency Hot Water condensing boilers 2. Install new hot water piping, primary, and secondary pumps, and expansion tank 3. Install new water condition system for boilers 3. Install new fin tube exchangers throughout the building 2. Install new DDC system that Monitors new boilers and integrates existing HVAC

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.