Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 23, 2023

April 1, 2024

February 1, 2025

23 Rue Principale N

Renovation

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

23 Rue Principale N, Saint-Bruno-de-Guigues, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1773283 Deadline for receiving complaints: 2023-11-09 Electronically transmitted submission accepted: Yes, in a single submission document Expected duration of the contract without options (in months): 10 The purpose of this mandate is to carry out construction work on the expansion for the new elevator at the Marie-Assomption school in St-Bruno-de-Guigues, as well as the related redevelopment work. In addition to all the work normally required for the complete completion of the work mentioned above, that is to say demolition, interior fittings and finishes, mechanical systems, electrical systems, control systems, etc., the work to be carried out within the framework of this mandate specifically shown in the drawings and described in the specifications include, among other things and without limitation, the supply and installation of materials, equipment and accessories required for: a) The expansion of the school to accommodate the new elevator; b) Installation of the new elevator; c) Asbestos removal/work in the presence of asbestos; d) Addition/Replacement of floor covering in the premises indicated; e) Addition/Replacement of suspended ceilings in the indicated premises; f) Painting of the indicated premises; g) Addition/Replacement of doors where indicated; h) Dismantling of windows and installation in the indicated locations; i) Structural/mechanical/electrical works according to the engineering plans provided; j) Relocation of equipment following the work according to the customer's needs. ANNEX 0.01.12 - DEADLINE Unless otherwise decided by the PARTIES in accordance with the Contract, the Works must be carried out according to the following Schedule under penalty of having to pay the penalties provided for. 1-Start of exterior work: April 1, 2024 Interior work can begin at the beginning of April in certain premises on an evening schedule starting at 6:00 p.m. From June 25, 2024, the work schedule will be able to return to daytime. 2-Commissioning of the elevator: August 23, 2024 The premises used for school purposes must be delivered by August 23, 2024. The work schedule must return to an evening schedule after August 23, 2024.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects