Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 4, 2023

No Information to Display

200 NeoCity Wy

Addition, Demolition, Renovation, Site Work

No Information to Display

$23,000,000.00

Public - County

img_map_placeholder

200 NeoCity Wy, Kissimmee, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of May 19, 2023 information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: The Center for Neovation, an Advanced Manufacturing Semiconductor Fabrication Lab located at 200 NeoCity Way, NeoCity, Florida 34744, is renovating, upgrading, facilitating and installing process equipment within the remaining open areas of the existing facility and requires proposals for the design and construction management of the modifications. This project will be funded with Federal funds from the United State Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with that program. 1. The purpose of this Scope of Services is to obtain proposals from qualified Architectural Engineering Firms for the design documents required to modify and renovate the facility and infrastructure to support such. Infrastructure Improvements scope will include, expanding and upgrading cleanroom space for Advanced Packaging Processing including modifications and expansion of the existing filtration, HVAC, and exhaust systems, increasing of the Ultra-Pure Water Treatment plant capacity, expansion and modification of the distribution of the existing Ultra Clean Process Services, chemical distribution and collection services and systems, and the required electrical service modifications and additions, to support the expansion, including improving Emergency Backup Power Capabilities (UPS) for Semiconductor Tools, Equipment and Machinery. 2. The intention is that The County will solicit Construction Manager at Risk Services for the project and The Construction Management firm will participate in the design, permitting and post-design services, supplying assistance during the design process to provide constructability reviews, sequencing input, and ensuring the project remains on budget and schedule real time. Piggyback Solicitation No Insurance Required No Bid Bond Required No Performance Bond Required No Question End Date 1/6/2023 12:00 PM Anticipated Award Date 4/3/2023 The method of contractor selection has not been determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.