Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

January 1, 2024

December 31, 2024

To Be Determined

Site Work

No Information to Display

$587,026.00

Public - City

img_map_placeholder

To Be Determined, Minneapolis, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

For additional information or questions, contact the buyer. All questions must be submitted in writing. Traci L Reimringer traci.reimringer@minneapolismn.gov 2024 Large Area Turf Establishment, The City of Minneapolis is issuing this Call for Bids for prospective suppliers to provide all materials, labor, equipment and incidentals necessary for 2024 Large Area Turf Establishment for PW-Trans Maintenance & Repair, all in accordance with the provided specifications, event line items and all documents requested herein. Remove all soils and sediments tracked or otherwise deposited onto public and private pavement areas. Removal shall be daily when tracking occurs. Additional sweeping is required at any time if conditions warrant. Sweeping shall be maintained throughout the duration of the construction and done in a manner to prevent dust being blown to adjacent properties. Removals and proper disposal of all swept materials is incidental to this item. Locate soil or dirt stockpiles no less than 25 feet from any public or private roadway or drainage channel. If remaining for more than seven days, stabilize the stockpiles by mulching, vegetative cover, tarps, or other means. Control erosion from all stockpiles by placing silt barriers around the piles. Temporary stockpileslocated on paved surfaces must be no lessthan two feet from the drainage/gutter line and shall be covered if left more than 24 hours. In rare circumstances, unusual conditions may require work beyond the scope of this agreement. Contractor may request additional compensation for actual labor hours required to complete this work. Labor hours paid under this Contract shall be only for productive hours at the job site and are subject to the approval of the Engineer.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.