Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 21, 2022

February 20, 2023

October 1, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$5,195,577.00

Public - City

img_map_placeholder

Multiple Locations, Hooper, UT

Subscribe to View Full Documents

The reconstruction of approximately 4,900 feet of 5500 West roadway between 4200 South to 3550 South; construction includes storm drain system, curb and gutter, sidewalk, pavement, gravity irrigation system, and adjustments to existing utilities. The project will be separated into a base bid and additive bid. Bids will be received for a single prime contract. Bids shall be on a lump sum and unit price as indicated in the Bid Form. Est. Completion Date: Oct. 1, 2023 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email: Sam Powell, J-U-B Engineers, Inc at spowell@jub.com Phase 1 (Base Bid) work will include the following: o All roadway, curb and gutter, sidewalk, landscape restoration, storm drain and irrigation and utility work from 4200 South to north side of 4000 South. This will include all work within UDOT right-of-way on SR-37 (4000 South). o All gravity irrigation work from 4200 South to 3500 South. o Storm drain main line from 4000 South to 3500 South Phase 2 (Additive 1) work will include the following: o All roadway, curb and gutter, sidewalk, landscape restoration, storm drain and irrigation and utility work from 4000 South to 3500 South not completed with Phase 1. This will include storm drain laterals to inlets. Last Day for Questions: Friday, December 16 at 5:00 pm

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects