Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2026

No Information to Display

2600 7th Ave

Paving, Site Work

No Information to Display

$634,000.00

Public - City

img_map_placeholder

2600 7th Ave, Ketchikan, AK

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Update:https://www.kgbak.us/DocumentCenter/View/12831/KGB-Capital-Improvement-Plan-2025-2029-FINAL The Rainbird Trail in Ketchikan consists of two segment each of approximately 2/3 of a mile: the southerly section maintained by the Borough, and a northerly section traversing properties belonging to the City and UAS. This project provides for repairs due to storm damage and acquisition and upgrades throughout. Phase I: Upgrades to the UAS segment of the project area, including installation of no fewer than (2) bridges and (2) staircases. Work will include acquiring and discharging materials for a contractor or volunteer organizations to install. Phase II: Upgrades to the southerly segment of the trail to resolve loss of grading materials. The overall project will include restrained section trail surfacing, rather than the existing free-edge grading throughout. This will minimize loss of surfacing. Project is included Ketchikan Gateway Borough Fiscal Year 2025-2029 Page no 55 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.kgbak.us/DocumentCenter/View/11311/Major-Projects-and-Capital-Improvement-Program-2024-2028---Updated The Rainbird Trail in Ketchikan consists of two segment each of approximately 2/3 of a mile: the southerly section maintained by the Borough, and a northerly section traversing properties belonging to the City and UAS. This project provides for repairs due to storm damage and acquisition and upgrades throughout. Phase I: Approximately $50,000 appropriated in FY 2022 for emergency repairs and as matching for prospective grants. Remaining funds will be reappropriated, with an additional $50,000 to come from the CPV fund. Phase II: Both the maintained and unmaintained segments of the Rainbird Trail require extensive improvement simply to sustain the current level of service, above and beyond the emergency work completed in FY 2021. Project is included Ketchikan Gateway Borough FY 2024-2029 ClP. 52 __________________________________________________________________________________________________________________________________________________________________ The Rainbird Trail in Ketchikan consists of two segment each of approximately 2/3 of a mile: the southerly section maintained by the Borough, and a northerly section traversing properties belonging to the City and UAS. This project provides for repairs due to storm damage and acquisition and upgrades throughout. Phase I: Approximately $50,000 appropriated in FY 2022 for emergency repairs and as matching for prospective grants. Remaining funds will be reappropriated, with an additional $50,000 to come from the CPV fund. Phase II: Both the maintained and unmaintained segments of the Rainbird Trail require extensive improvement simply to sustain the current level of service, above and beyond the emergency work completed in FY 2021. Project is included Ketchikan Gateway Borough FY 2023-2027 ClP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.