Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 5, 2024

September 1, 2027

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Kronenwetter, WI

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

As of August 3, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Solicitation ID: NC-03 Route : IH 039S County : 37 - Marathon County, 49 - Portage County Limit : USH 10 TO STH 34, SB Anticipated Construction Cost: $3,000,000-$3,999,999 The pavement needs treatment to extend its service life. Perpetuation project of 9.81 centerline miles of IH39 between Stevens Point and Wausau, from USH 10 to STH 34 in the Town of Knowlton and Dewey in Portage County. Concrete pavement joint and crack repair, including the CTH DB ramps, and mill and overlay existing asphalt pavement. Other work includes guardrail replacement, fencing replacement on three structures (B-37-0144, B-37-0141, C-37-0054), replace existing endwalls or end sections on nine culverts, and investigate concrete alternatives at the IH39 SB to USH 10 WB mainline/ramp. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Stevens Point - Wausau *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects