Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 20, 2022

January 19, 2023

August 22, 2023

To Be Determined

Site Work

No Information to Display

$599,632.00

Public - City

img_map_placeholder

To Be Determined, Melbourne, FL

Subscribe to View Full Documents

All questions about the meaning or intent of this Invitation to Bid must be submitted in writing at least fourteen (14) calendar days prior to bid due date. All questions must be directed to the City of Melbourne, 900 E. Strawbridge Avenue, Melbourne, FL 32901, Attention: Lisa Solina. The project consists of replacement of approximately 1,260 linear feet of 8-inch force main with 8-inch HDPE pipe via open cut, directional drill, and jack & bore, connecting from LS No. 38, located near the intersection of E. NASA Boulevard and Hickory Street, to approximately 80-LF upstream of MH 5250, located at the NW intersection of E. NASA Boulevard and S. Apollo Boulevard, crossing under the FEC Railway. The work consists of furnishing all material, labor, and equipment necessary for constructing LIFT STATION NO. 38. All work is to be done in accordance to the plans and specifications of Project No. 32113. The Contractor shall not subcontract more than 50% of the work based on the total contract price. The Contractor will be required to provide a list of Subcontractors and the value of each Subcontractor's portion of the work. The successful bidder must be able to show a past history of successfully completed five (5) HDPE pipe line projects including wet taps, and asphalt repair, within the past five (5) years that are compliant with the applicable permits and standards. Contractor, or its sub-contractor(s), shall possess and maintain during the term of this Agreement the following licenses and/or certifications: 1. Florida Registered or Certified General Contractor or Building Contractor 2. Florida Registered or Certified Underground Utilities Contractor

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.