Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
January 19, 2024
No Information to Display
I-20 & US-278
New Construction, Site Work
No Information to Display
No Information to Display
Public - State/Provincial
I-20 & US-278, Stonecrest, GA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
As of August 9, 2023, a design team has been selected. *The previous solicitation is listed below for reference. The Georgia State Financing and Investment Commission (GSFIC), as “Owner”, on behalf the Technical College System of the State of Georgia and Quick Start (“Using Agency”) is seeking Statements of Qualifications from firms interested in providing design professional services for a project known as Project No. TCSG-397 Quick Start EV Training Center -Newton County. Maximum building capacity is currently projected to be 500, and DP (Design Professionals) will comply with the Georgia State Properties Commission’s guidelines regarding assignment of spaces. Assuming a general estimate of the building size to range between 80-100,000-sq.ft., the Training Center will include classrooms, technical labs, high-capacity spaces suitable to contain manufacturing-scale training simulations incorporating robotics, mechatronics, welding, motors, and other advanced manufacturing technologies. There will be a critical demand for hardwired and wireless networking capabilities, multiple segmented and secured server spaces, and A/V installations. Designated training spaces will also need appropriate utilities, air-handling and safety/emergency response capabilities related to high-voltage components, “thermal runaways” and potential toxic chemical release. The Center will require robust safety, security, fire suppression and emergency response systems. Candidate teams will demonstrate competency and experience in sustainable, healthy-building design strategies, Maximum building capacity is currently projected to be 500, and DP (Design Professionals) will comply with the Georgia State Properties Commission’s guidelines regarding assignment of spaces. Assuming a general estimate of the building size to range between 80-100,000-sq.ft., the Training Center will include classrooms, technical labs, high-capacity spaces suitable to contain manufacturing-scale training simulations incorporating robotics, mechatronics, welding, motors, and other advanced manufacturing technologies. There will be a critical demand for hardwired and wireless networking capabilities, multiple segmented and secured server spaces, and A/V installations. Designated training spaces will also need appropriate utilities, air-handling and safety/emergency response capabilities related to high-voltage components, “thermal runaways” and potential toxic chemical release. The Center will require robust safety, security, fire suppression and emergency response systems. Candidate teams will demonstrate competency and experience in sustainable, healthy-building design strategies, such as on-site renewable energy generation; all-electric systems; use of mass-timber systems in structural, enclosure and acoustic design; and recommendations for carbon-accounting solutions such as assessment of embodied carbon in the life cycle of selected materials, and monitoring of operational release of GHGs, with the ultimate goal being net-zero carbon emissions. One aspect unique to this project bidders should factor into their proposals is that a sizable portion of the traditional Conceptual Design phase will be accelerated due to the fact that the Company will provide an existing set of conceptual recommendations to serve as a starting point for facility programming, allowing the team to rapidly move into the Schematic Design phase with an aggressive goal of building completion taking place in the fourth quarter of 2024. The DP will also provide recommendations as appropriate to further accelerate the design and construction processes without compromising the integrity and functionality of the building project. Considering the current challenges regarding the availability of certain materials and equipment, the DP will provide ongoing due diligence to inform the OAC team of fluctuations in costs and availability of considered materials, fixtures, devices, etc. to facilitate decision-making that balances choice preferences with controlled costs and tight deadlines. The Design Professional’s services are anticipated to commence early in the first quarter of 2023 with 75% construction documents anticipated for completion by the end of the third quarter of 2023. It is envisioned that Construction would start with the issuance of an early component package thereafter, with material completion being reached by the end of the fourth quarter of 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Stonecrest, GA
--
Stonecrest, GA
Bid Date: Oct 26 2023
Stonecrest, GA
Bid Date: Oct 03 2023
Stonecrest, GA
Bid Date: May 10 2024
Augusta, GA
Bid Date: Aug 30 2023
Atlanta, GA
Bid Date: Aug 09 2023
Fayetteville, GA
Bid Date: Jun 21 2023
Morrow, GA
Bid Date: Aug 10 2023
Albany, GA
Bid Date: Aug 22 2023
Macon, GA
Bid Date: Aug 18 2023
Forsyth, GA
Bid Date: Aug 18 2023
Riverdale, GA
Bid Date: Jun 29 2023
Blue Ridge, GA
Bid Date: Jul 11 2023
Douglas, GA
Bid Date: Aug 10 2023
Jonesboro, GA
Bid Date: Jul 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
