Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 7, 2023

October 30, 2023

July 31, 2025

1537 University Blvd

New Construction, Site Work

No Information to Display

$16,000,000.00

Public - State/Provincial

img_map_placeholder

1537 University Blvd, Morrilton, AR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The owner has selected a Construction Manager. The University of Arkansas Community College Morrilton, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for the construction of an Allied Health and Science Center. The University of Arkansas Community College at Morrilton (UACCM), a campus included in the University of Arkansas System and governed by the Board of Trustees of the University of Arkansas, is seeking to construct an Allied Health and Science Center to consolidate the schools health professional training programs from several smaller existing buildings on the UACCM Campus to a new, state of the art facility. The nursing program in specific has outgrown their current educational space due to increasing enrollment. The project consists of the construction of an allied health and science education building, demolition of current structure on site, site utility improvements including water, sewer, gas, electric/power relocations and improvements, and site grading and drainage improvements funded in part by the U.S. Department of Commerce Economic Development Administration. Currently UACCM has a $14 million budget for the project. This includes a $3 million EDA (Economic Development Administration) Grant with the rest being funded through reserves, private donations, and bonding. General contractors and architect/engineering services will work with university personnel and Facilities Management to in design and requirements of building. Statements of Qualifications will be reviewed by a selection committee and a short-list of firms will be invited to interview with the university. The university welcomes proposals from firms with a diverse workforce, including women-owned, minority-owned, and service-disabled veteran-owned firms and joint ventures including such firms. Professional Services Required Include: Guaranteed Maximum Price/fast Track Management Construction Management-general Contractor Project Management, Estimating, Subcontractor Selection, Project and Change Order Pricing, Demolition, Schedule Control, Cost Reduction and Control, Project Coordination, Building Information Modeling (Bim), Closeout, and Warranty. the range of a two story building at 32k-36k sq feet. $14-16million

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects