Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 11, 2023

August 3, 2024

10315 CA-178

New Construction, Outdoor Lighting, Paving, Site Work

No Information to Display

$11,475,000.00

Public - City

img_map_placeholder

10315 CA-178, Bakersfield, CA

Subscribe to View Full Documents

The work to be performed consists in general, but not limited to, rough & fine grading, construction of four (4) softball fields with LED sports lighting, concrete sidewalks, installation of prefabricated concession & restroom building & fabric shade sails, storm drain & sewer improvements, site lighting, electrical system including switch gear & conduits etc., installation of irrigation system & landscaping, & a (90) day maintenance period. The project consists of a Base Bid & three (3) Additive Alternates (Add Alts); therefore, the Contractor shall submit bids for the Base Bid & all three (3) Additive Alternates. However, the City of Bakersfield will determine the lowest bidder based on the Base Bid only. The Add Alts include a parking lot & roadway with HMA pavement, additional landscaping & walkways, & the installation of a prefabricated railcar pedestrian bridge. Additive Alternates may or may not be selected depending on funding availability. This is a Re-Bid. Changes include making the perimeter landscaping Add Alt #2 & the prefabricated railcar pedestrian bridge as Add Alt #3 and adding working days to complete the Base Bid and Additive Alternates. Contractor shall use only plans, specifications, and any other bid documents which are labeled as "Re-Bid" for bidding and construction purposes. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $3,000.00 per day Project Duration 250 working days

120 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects