Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
December 12, 2023
No Information to Display
101 W Daniels St
Renovation
No Information to Display
$1,050,000.00
Public - City
101 W Daniels St, Cincinnati, OH
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Dabney Hall is a traditional residence hall currently housing 400 students. Built in 1960, Dabney Hall is one of the oldest dorm buildings on the Universitys Uptown West Campus. The building consists of 2 main north-south wings connected by a smaller east-west wing in a zig-zag configuration. The bathrooms are stacked, and occur in 3 locations designated by the University as Stack A, B, and C. This project will replace all the drain, waste, and vent piping, domestic hot- and cold- water piping, and update the partitions, lighting, fixtures and finishes in all 3 stacks over multiple years. The first phase, targeted for construction in Summer 2023, will address only Stack A. The AE selected under this RFQ will, at the University discretion, be engaged for additional services to design Stacks B and C as those funds are allocated for future years. For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the Program of Requirements. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owners project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. Estimated Basic Fee Range (see note below) 7.5% to 8.25% EDGE Participation Goal Percent of initial Total A/E Fee: 5.0%
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cincinnati, OH
Bid Date: Jan 29 2024
Cincinnati, OH
Bid Date: Aug 25 2023
Cincinnati, OH
Bid Date: Jul 12 2023
Cincinnati, OH
Bid Date: Aug 24 2023
Cincinnati, OH
Bid Date: Sep 12 2023
Cincinnati, OH
--
Cincinnati, OH
--
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jun 27 2023
Cincinnati, OH
Bid Date: Aug 07 2023
Cincinnati, OH
Bid Date: Aug 25 2023
Cincinnati, OH
Bid Date: Aug 31 2023
Cincinnati, OH
Bid Date: May 19 2023
Cincinnati, OH
Bid Date: Jul 31 2023
Cincinnati, OH
Bid Date: Jul 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
