Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

December 25, 2023

September 13, 2024

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$1,340,526.00

Public - City

img_map_placeholder

Multiple Locations, Fargo, ND

Subscribe to View Full Documents

This Project is using SRF Loan Funds and Federal Funds and there are additional terms and conditions required to comply with the contract specifications. Please confirm all requirements are met and documents are included with your bid. This Project will comply with SRF and Federal requirements. In the event of a discrepancy between City of Fargo contracting requirements and SRF and Federal contracting requirements, the SRF and Federal contracting requirements shall prevail. BR-24-C1 of the following: South Woodcrest Drive North from Lilac Lane North to Willow Road North & North Woodcrest Drive North from Willow Road North to Lilac Lane North. Bids shall be on the basis of cash payment for work performed. Bidders are required to comply with Davis-Bacon prevailing wage requirements. All bidders should be advised that if awarded, the Contractor shall comply with the (i) American Iron and Steel requirements; (ii) Civil Rights requirements; (iii) Equal Employment Opportunity requirements; (iv) create an affirmative action plan; (v) provide evidence of compliance with the Disadvantaged Business Enterprises (DBE) participation; (vi) and provide evidence of compliance with the Davis Bacon Act as more fully set forth in the Contract. All of the foregoing is located in the City of Fargo, Cass County, North Dakota. Lots 16 through 30, Block 2, Inclusive. Lots 1 through 15, Block 3, Inclusive. All in the Van Raden's 2nd Addition. The existing water main on 1st Street is ACP, which was installed over 50 years ago, is being replaced to minimize impacts and costs associated with breaks. As part of this, we will replace the water main services to the curb stop and the sanitary services from the main to behind the curb. The street reconstruction is necessary because the existing street section has deteriorated significantly and has exceeded it's life expectancy. Reconstruction will include asphalt street paving, gravel base, curb and gutter, storm sewer inlets and leads, driveway approaches, sidewalk, and streetlights. If you have any questions concerning the shut down, please contact one of the following: 1. Contractor at construction site 3. Engineering Department 241-1545 4. Mains and Hydrants 241-8174

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.