Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
December 14, 2022
January 13, 2023
June 12, 2023
Golightly St
Outdoor Lighting, Paving, Site Work
No Information to Display
No Information to Display
Public - City
Golightly St, Fairburn, GA
As of August 3, 2023, construction is underway and nearing completion, however, an exact timeline for construction has not been confirmed. The City of Fairburn will accept sealed bids from qualified Contractors for furnishing all labor, equipment, and materials necessary to complete the GoLightly Street Pedestrian Improvements Project. The work includes the installation of new sidewalk, driveway aprons, and ADA ramps on both sides of Golightly Street in the City of Fairburn. The contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt and concrete, as well as clean up and backfilling. The scope of Add Alternate #1 consists of the installation pedestrian lighting within the project limits. Add Alternate #2 consists of the removal of the existing roll back curb & gutter and replacing it with new standard 24" curb & gutter. Add Alternate #3 includes milling, asphalt paving, the installation of traffic-print textured paving crosswalks, striping, manhole adjustments and other associated tasks. The scope of Add Alternate #4 includes the installation of 24" curb & gutter, 4' sidewalk, and open back catch basins on the east side of W. Campbellton Street, between Golightly Street and Dodd Street. All work must be completed within one hundred and fifty (150) calendar days of the Notice to Proceed with Construction (NTP). Questions of a technical nature should be submitted in writing to the City of Fairburn via electronic mail, to the procurement inbox: procurement@fairburn.com. Installation of a Concrete Sidewalk With a Beauty Strip on Both Sides of the Golightly Street, Along With Pedestrian Lighting. Golightly Street, From Dodd Street to W. Campbellton, Shall Be Striped for a Bicycle Lane. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Fairburn, GA
Bid Date: Aug 03 2023
Fairburn, GA
Bid Date: Aug 02 2023
Fairburn, GA
Bid Date: Sep 12 2023
Fairburn, GA
Bid Date: Oct 24 2023
Fairburn, GA
--
Fairburn, GA
Bid Date: Aug 10 2023
Fairburn, GA
Bid Date: Aug 17 2023
Fairburn, GA
Bid Date: Mar 01 2023
Jonesboro, GA
Bid Date: Sep 11 2023
Douglasville, GA
Bid Date: Nov 15 2023
Rex, GA
Bid Date: Aug 10 2023
Rome, GA
Bid Date: Aug 03 2023
Atlanta, GA
Bid Date: Aug 11 2023
Lagrange, GA
Bid Date: Jul 20 2023
Austell, GA
Bid Date: Aug 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
