Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 14, 2022

January 13, 2023

June 12, 2023

Golightly St

Outdoor Lighting, Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Golightly St, Fairburn, GA

Subscribe to View Full Documents

As of August 3, 2023, construction is underway and nearing completion, however, an exact timeline for construction has not been confirmed. The City of Fairburn will accept sealed bids from qualified Contractors for furnishing all labor, equipment, and materials necessary to complete the GoLightly Street Pedestrian Improvements Project. The work includes the installation of new sidewalk, driveway aprons, and ADA ramps on both sides of Golightly Street in the City of Fairburn. The contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt and concrete, as well as clean up and backfilling. The scope of Add Alternate #1 consists of the installation pedestrian lighting within the project limits. Add Alternate #2 consists of the removal of the existing roll back curb & gutter and replacing it with new standard 24" curb & gutter. Add Alternate #3 includes milling, asphalt paving, the installation of traffic-print textured paving crosswalks, striping, manhole adjustments and other associated tasks. The scope of Add Alternate #4 includes the installation of 24" curb & gutter, 4' sidewalk, and open back catch basins on the east side of W. Campbellton Street, between Golightly Street and Dodd Street. All work must be completed within one hundred and fifty (150) calendar days of the Notice to Proceed with Construction (NTP). Questions of a technical nature should be submitted in writing to the City of Fairburn via electronic mail, to the procurement inbox: procurement@fairburn.com. Installation of a Concrete Sidewalk With a Beauty Strip on Both Sides of the Golightly Street, Along With Pedestrian Lighting. Golightly Street, From Dodd Street to W. Campbellton, Shall Be Striped for a Bicycle Lane. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects