Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

January 6, 2025

No Information to Display

6287 128 St

Demolition, Site Work

No Information to Display

$20,000,000.00

Public - County

img_map_placeholder

6287 128 St, Surrey, BC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Stage II ITB to the prequalified firms only. -Construction, testing, and commissioning of a post disaster pump station facility, including all structural, architectural, utilities, process mechanical, building mechanical, HVAC, electrical, instrumentation, site restoration, site drainage, landscaping, and cleanup; -Supply, installation, integration, testing, and commissioning of all equipment, instruments, materials, and systems both constructed and modified; -Connection to the existing below grade Newton Reservoir outlets pipes and removal of the isolation flanges on the outlet pipes previously installed inside the Newton Reservoirs. Work includes removal of the outlet pipes test heads and any cleaning and safety provisions required to facilitate access and conduct Work within the reservoir cells; -Maintenance, backfill, and closure of the existing Launch Shaft; .6 Construction of Crossover Chamber 1 (as referred to as South Surrey Main No. 1 Crossover Chamber) including supply, installation, testing, and commissioning of all equipment and piping; -Partial removal and reconstruction of the chemical offloading pad at the existing Newton Rechlorination Facility; -Supply, installation, testing, and commissioning of sodium hypochlorite injection piping and sample line piping; -Restoration, cleanup, landscaping, and; -Related work including, but not limited to, the construction of access roads, pedestrian and traffic control, and compliance with safety requirements. and more... Question/RFI Deadline Date: 10/03/2024 at 2:00 PM PT

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.