Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 16, 2023
January 15, 2024
No Information to Display
Multiple Locations
Site Work
No Information to Display
$40,000,000.00
Public - State/Provincial
Multiple Locations, Jersey City, NJ
The Bidder must upload its bid prior to the hour specified so that it is included in the project download. Late bids cannot be accepted. This is the only way to submit a bid for this project; paper bids will not be accepted. The apparent bid results for this Invitation for Bids (IFB) will be made available for viewing electronically. The work under this IFB generally consists of, but is not limited to, the elements identified in Construction Contract GC.02 that includes the construction of six new electrified tracks serving three high level boarding platforms connected to the existing railroad right of way and includes a passenger concourse as part of a new rail personnel structure to an elevation above the FEMA base flood elevation (BFE). Other related rail infrastructure work involves: two pit pedestal inspection pits in the station area: an existing bridge modification; a new, two-track railroad bridge that connects the new station to the existing commuter tracks with related track: catenary, signal and other work including a realignment of active commuter tracks and the related overhead catenary structures. All work must be in strict conformance with the drawings and technical specifications provided in the Bid Documents. All bidders must be prequalified by NJ TRANSIT prior to submitting a bid. Bidders must be prequalified for HR Heavy Construction (Operating Railroad Environment) in a classification of GC General Contractor and for an amount of work that is equal to or greater than their bid amount. NJ TRANSIT suggests a minimum rating amount of R over $25,000,000.00. Bidders who are not currently prequalified as required above or whose prequalification has expired must submit completed prequalification forms to Samantha Chavanga by emailing schavanga@njtransit.com no later than the submittal date identified in the Special Provisions. Late prequalification request submissions will not be considered for this solicitation and will disqualify a firm from submitting a bid. Contractors must bring and wear their own safety apparatus including hard hats, reflective vests, hard toed shoes/boots and must wear a mask in order to go on the site visit. Failure to bring the required PPE and mask will result in denial of a Bidder to walk the site. Contractors are advised that a NJ TRANSIT escort is necessary while present on NJ TRANSIT property. Unauthorized/unescorted visits are strictly prohibited. Attendance at both the pre-bid conference and site visit is strongly recommended. This project is subject to the requirements of the Public Works Contractor Registration Act (N.J.S.A. 34:11-56.48 et seq.). Contractors and subcontractors must also comply with the State of New Jersey Division of Revenue and Enterprise Services Business Registration Certificate requirements (N.J.S.A. 52:32-44). Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27, regarding Equal Employment Opportunity and Affirmative Action rules and regulations. Disadvantaged Business Enterprises, in accordance with U.S. Department of Transportation (DOT) regulations, 49 C.F.R. Part 26, shall have the maximum opportunity to participate in the performance of this project. An eighteen percent (18%) DBE goal has been assigned to this project. In accordance with N.J.S.A. 27:25-11(b)(3) and N.J.A.C. 16:72-2.2, bidders are notified that a bid bond in the amount of ten percent (10%) of the bid price is required with their bids. Contractors must bring and wear their own safety apparatus including hard hats, reflective vests, hard toed shoes/boots and must wear a mask in order to go on the site visit. Failure to bring the required PPE and mask will result in denial of a Bidder to walk the site. Contractors are advised that a NJ TRANSIT escort is necessary while present on NJ TRANSIT property. Unauthorized/unescorted visits are strictly prohibited. Attendance at both the pre-bid conference and site visit is strongly recommended. This project is subject to the requirements of the Public Works Contractor Registration Act (N.J.S.A. 34:11-56.48 et seq.). Contractors and subcontractors must also comply with the State of New Jersey Division of Revenue and Enterprise Services Business Registration Certificate requirements (N.J.S.A. 52:32-44). Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27, regarding Equal Employment Opportunity and Affirmative Action rules and regulations. Disadvantaged Business Enterprises, in accordance with U.S. Department of Transportation (DOT) regulations, 49 C.F.R. Part 26, shall have the maximum opportunity to participate in the performance of this project. An eighteen percent (18%) DBE goal has been assigned to this project. In accordance with N.J.S.A. 27:25-11(b)(3) and N.J.A.C. 16:72-2.2, bidders are notified that a bid bond in the amount of ten percent (10%) of the bid price is required with their bids. This Section consists of furnishing all materials, products, accessories, tools, equipment, services, transportation, labor, supervision, requirements, and procedures and methods related to the Contractor's responsibilities for providing soil erosion and sediment control. Erosion protection shall consist of temporary control measures as shown on the Contract Drawings, during the life of the Contract, to control water and air pollution, using mulch, grass, or hay bale barriers, stone filter pads, silt fabric fences, floating turbidity barriers, and inlet filters. 2. The temporary pollution control or erosion protection provisions contained herein shall be coordinated with the permanent erosion control features specified elsewhere in the Contract to the extent practical to assure economical, effective and continuous erosion control throughout the construction and post construction period 3. All soil erosion and sediment control facilities shall be in place prior to any earthwork operation, demolition and/or installation of proposed structures or utilities. for land disturbing activities as described herein and as shown on the Contract Drawings.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Jersey City, NJ
--
Jersey City, NJ
--
Jersey City, NJ
--
Jersey City, NJ
Bid Date: Aug 11 2023
Jersey City, NJ
--
Jersey City, NJ
Bid Date: Aug 22 2023
Jersey City, NJ
Bid Date: Aug 23 2023
Jersey City, NJ
--
Jersey City, NJ
--
Jersey City, NJ
--
Jersey City, NJ
Bid Date: Jul 27 2023
Jersey City, NJ
--
Jersey City, NJ
Bid Date: Aug 04 2023
Toms River, NJ
Bid Date: Jun 30 2023
Rockaway, NJ
Bid Date: Jun 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
