Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

June 27, 2024

100 N College Dr

Renovation

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

100 N College Dr, Franklin, VA

Subscribe to View Full Documents

Sealed bids are invited for the construction of Replace HVAC Administration Building at Paul D. Camp Community College, Franklin Campus, Project Code # 260-18501-000 located in Franklin, Virginia. The project is generally described as an HVAC replacement project and includes associated piping replacements and modifications. A Standard Commonwealth Bid Bond is required (form CO-10.2) and Contract Security is required for any bid regardless of bid amount. Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and 2.2-4330, Code of Virginia. The Owner reserves the right to reject any or all bids. Replacement of multiple heat pumps, air handling units, pumps, boilers, cooling tower, unit heaters, fume exhausters and exhaust fans. Modifications to ductwork and piping is required to facilitate the new work. Electrical modifications to the building are also included to facilitate the installation of the above-mentioned equipment. Maintain existing building in a weathertight condition throughout the construction period. Repair any damage to the building or grounds caused by construction operations. Protect building, its contents and occupants throughout the construction period. Additive Bid Item A: All exterior roof mounted ductwork shall be replaced with phenolic ductwork.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.