Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 6, 2022

June 1, 2023

August 7, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$4,431,997.00

Public - City

img_map_placeholder

Multiple Locations, Glendora, CA

Subscribe to View Full Documents

Bennett Ave, Washington Ave, Westridge Ave, and Bender Ave consists of installing 7335 new 8-inch water main and 329,000 square feet of street improvements. Street improvements include pavement rehabilitation, concrete sidewalk repairs, curb and gutter repairs, ADA compliant curb ramps, traffic signal loop replacement, signing, and striping. This project will include a striping concept which will incorporate marked bike lanes. Street improvement plans should include sufficient details necessary for constructions, including typical sections. Additionally, this project includes improvements to address drainage issues. The new water main will go under the existing storm drain across Bennett Ave.

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.