Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

January 8, 2024

Multiple Locations

Site Work

No Information to Display

$998,104.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Benicia, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Project Description: The project generally consists of replacing existing guardrail, barricades and appurtenances with new materials and products which will meet new safety standards, shoulder rehabilitation, minor concrete, and striping and pavement markings. The project will be governed by the Contract Documents included herewith, including the Caltrans State Standard Specifications, 2018 edition, in the order of precedence as set forth herein. The City of Benicia previously invited Bids for the Guardrails Upgrade Project in May 2023. At that time, the apparent low bid exceeded the authorized funds for the project and all bids were rejected. This Invitation to Bid is for a Base Bid with 3 Bid Alternatives. Technical changes have also been made to the project. A revised street barricade detail in included. Reduced quantities for replacement of guardrails and minor concrete occurred at a few locations. Valtir's Soft Stop System has replaced the Trinity Soft Stop system for guardrail end terminals. Location of Work: Various Locations in the City of Benicia. The Engineer's Opinion of Probable Costs for the base bid is approximately $700,000 Completion of Work: All base project work shall be completed within 55 Working Days from the date when the Contract Time commences to run. An additional 5 working days will be added to the base bid for completing all work for each Bid Alternate awarded to the Contractor. The number of Federal Aid Trainees is 0. Liquidated Damages: $3,500 per day. Instructions: Bidders shall refer to the Instructions to Bidders section for required documents and items to be submitted as set forth in Paragraph 1.01 above. Pre-Bid Site Visit and Meeting: There will be no pre-bid site visit or meeting. Bid Preparation Cost: Bidders are solely responsible for the cost of preparing their Bids Reservation of Rights: Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.