Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 13, 2023

July 15, 2024

November 24, 2025

906 E 1st St

New Construction, Site Work

No Information to Display

$15,330,112.00

Public - State/Provincial

img_map_placeholder

906 E 1st St, Thibodaux, LA

Subscribe to View Full Documents

Part A: Pre-construction Services (Design-assist) And Part B: Construction Services Construction of a new, approximately 34,235 s.f. building & associated site development. See Section 7 and Exhibit C for further details. The estimate of the probable construction cost (GMP) for this Project is $16,117,500.00 and the target date for completion is November 24, 2025. This project consists of the design of a new, approximately 34,235 s.f. facility for the Nicholls State University Nursing Program, located in Thibodaux, Louisiana. The new facility will be a free-standing multi-story building adjacent to Ayo Hall (the existing nursing college building), with a new plaza between the two buildings. The plaza will include amenities such as seating, landscaping and possibly exterior art. Displaced parking will be located in the existing Guidry Stadium parking lot adjacent to the proposed site. This new facility will include classrooms, lecture space, office space for faculty and support staff, and space for technical, laboratory and clinical training. See Exhibit C for complete program. The CMAR contractor shall be responsible for all coordination between the Owner, User Agency and the Designer required to integrate and install the following Project elements, which are included in the Project, but not in the CMAR contractor's contract scope : New equipment acquisitions and installation (non-building systems equipment) New non-fixed furniture acquisitions/installation and audio-visual (AV) equipment, if applicable Information Technology hardware (i.e. PCs, servers, etc.) The State reserves the right to accept or reject, in whole or in part, all Proposals submitted and/or cancel the announcement if it is determined to be in the State's best interest

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.