Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 2, 2025

No Information to Display

Kellogg Blvd

Paving, Site Work

No Information to Display

$8,700,000.00

Public - City

img_map_placeholder

Kellogg Blvd, Saint Paul, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project Description: The purpose of this Request for Proposal (RFP) is to solicit proposals from consulting firms to perform engagement and design services between 2023 and 2025 for the second phase of the Capital City Bikeway on Kellogg project. The goal of this federally funded project is to add a bicycle facility to the north side of Kellogg Boulevard between St. Peter Street and W 7th Street, consistent with the Capital City Bikeway Network Study and Design Guide. As of October 17, 2023, this project is in the design/planning stage, a design team has not been identified. Construction is expected in FY2025.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.