Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
October 16, 2023
No Information to Display
1 Jefferson Barracks Dr
Renovation
No Information to Display
$1,000,000.00
Public - Federal
1 Jefferson Barracks Dr, Saint Louis, MO
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
657-21-117JB Correct Deficiencies Identified During Triennial Testing 8-3-2023 Scope of Work (See Plans and Specifications for the full Scope of Work) The Construction firm must provide construction services as delineated in the Plans and Specifications. The following deficiencies below were identified during the FY2019 Triennial Electrical Testing required under VHA Directive 1028. This project will correct deficiencies remaining after testing. New equipment shall have all the required working clearances. Building 1 Replacement of panels per plans and specifications. Building 3 Replace Panel P3 in Basement Mechanical Room 001. Provide NEMA 3R, and misc per plans and specifications. Building 18 Replace panel(s) per plans and specifications. Building 24 Replace panels in Ground Floor Kitchen Room G06 per plans and specifications. Building 25 replace panels per plans and specifications. Building 51A Replace other issues per plans and specifications. Building 53 - Replace other issues per plans and specifications. The majority of electrical equipment in this facility has sprinkler heads, related water pipes and drainpipes directly over or within the spray pattern of the electrical equipment as represented by the picture to the right. Install protective covers to prevent water from getting into the electrical equipment nor are physical protective devices installed to protect the actual sprinkler heads from physical damage. Both are required by National Electric Code section 110.26(F)(1)(a) through (F)(1)(d). Shields need to be installed in all areas where electrical components are within the spray pattern or have overhead water lines to prevent damage to prevent overhead water sources (sprinklers and water lines) from penetrating the enclosures. Such penetration could lead to a potentially catastrophic failure. Protective covers or cages need to be installed on unprotected sprinkler heads to prevent accidental activation with the same potential for catastrophic failure as mentioned above per plans and specifications.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Saint Louis, MO
Bid Date: Sep 12 2022
Saint Louis, MO
Bid Date: Oct 26 2023
Saint Louis, MO
Bid Date: Nov 16 2023
Saint Louis, MO
Bid Date: Oct 31 2023
Saint Louis, MO
Bid Date: Oct 03 2023
Saint Louis, MO
Bid Date: Oct 12 2023
Saint Louis, MO
Bid Date: Oct 12 2023
Saint Louis, MO
Bid Date: Oct 27 2023
Saint Louis, MO
Bid Date: Sep 07 2023
Saint Louis, MO
Bid Date: Aug 24 2023
Saint Louis, MO
Bid Date: Aug 17 2023
Saint Louis, MO
Bid Date: Sep 29 2023
Saint Louis, MO
Bid Date: Aug 18 2023
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Sep 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
