Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 1, 2024

July 1, 2026

Multiple Locations

New Construction, Site Work

No Information to Display

$35,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Estacada, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

City of Estacada, Oregon ("City") is requesting sealed proposals from qualified firms to provide wastewater engineering services for pre-design, design, and construction phase assistance for the Estacada Wastewater System Improvement Project. The schedule anticipates completion of the pre-design and design efforts to solicit construction bids by early 2024. City is seeking qualified firms to provide professional engineering services for all required tasks, including without limitation, the following: Pre-Design assistance to determine project feasibility, confirming the new plant location and pipeline alignments, assistance in securing needed properties or easements, assistance in securing the funding program; Design Phase Services include securing Clackamas County land use approvals, preparing a mixing zone study and securing DEQ permitting approval for the relocated outfall on the Clackamas River. Preparation of construction plans and specifications are required for a new membrane treatment facility, approximately 12,000 feet of new trunk sewer, plans for a transfer pump station and force main from the existing treatment plant site, and modifications of two existing pump stations; and Construction Phase Services to include administering the bid solicitation process, construction inspection and project administration. Upon complete of of the new facility, the consultant shall also provide engineering services to decommission the existing treatment plant to reclaim the site. As of October 19, 2023, a design team has been selected. Per owner, design will be completed by September 2024 and construction completed by mid 2026.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.