Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 28, 2023

No Information to Display

4040E 9th Ave N

Renovation

No Information to Display

$13,200,000.00

Public - State/Provincial

img_map_placeholder

4040E 9th Ave N, Regina, SK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

LLM22044 RPCC Building #1 Boiler Replacement to include Remediation of hazardous materials; Removal of existing Saskatoon Boiler Company 3000KW Boilers (2) and associated equipment and piping; Removal of off-line boiler and associated equipment and piping. This boiler provided domestic hot water to kitchen and laundry and no longer utilized; and Complete demolition of chimney stacks and piping. The main boiler project will take precedents over the re-life project with expected completion over a period of two fiscal years of construction. CSS23003 Building #1 Re-Life. The objective of this project is to extend the life of the aging building constructed in the 1960s by developing designs for a phased construction plan. The construction plan will address building structural issues, building envelope, electrical and mechanical services past life expectancy. Included is Building code related issues that were not completed in previous projects. TIMELINE: Design is underway. All design phases including pre and post construction will be completed under one agreement for the Boiler Replacement and one agreement for Re-Life. Construction documents for the two projects will only be combined to allow for simultaneous construction in the same area to allow for desired synergies. Multiple tender packages will be required due to phasing and funding. Tender and construction schedules may be confirmed fall/late 2023. Estimated construction costs: LLM22044 Building #1 Boiler Replacement is $2.2 million. CSS23003 - Building #1 Re- Life $11 million.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.