Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

December 12, 2023

March 1, 2025

2263 Otranto Rd

Addition, Demolition, Renovation, Site Work

No Information to Display

$7,266,725.00

Public - County

img_map_placeholder

2263 Otranto Rd, North Charleston, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of October October 16, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Requests for interpretation of this RFQ and any other questions concerning the RFQ shall be made in writing and addressed to Lawrence Lutrario, Construction Procurement Officer with a copy to Program Manager, and received no later than 12:00 P.M. on September 28, 2023 The work includes, but is not limited to, the construction of a new, one-story, fully sprinkled, 11,500 square foot building located on the existing Deer Park Middle School campus (2263 Otranto Road, North Charleston, SC 29406). The facility will be composed predominantly of load bearing masonry veneered with utility brick and reinforced with structural steel, joists, trusses, and metal decking. The roof system is a 2-ply modified bitumen system. Mechanical system is an air-to-air direct expansion system with dedicated outdoor air units. Finishes will include but are not limited to: SVT, ceramic and quarry tile, sealed concrete flooring, carpet, acoustical ceilings, paint, casework, marker/tack boards, and kitchen equipment. The package includes basic electrical services, life safety systems, information technology systems, and cable trays. Sitework is also part of this contract and consists of the installation of utilities, paving, sidewalks, curb & gutter, fencing, grassing and landscaping. Project will be required to be designed and constructed in accordance with CCSD's Educational Specifications and Design Requirements. The project will be constructed in two phases with full project completion by no later than March 1, 2025 The work includes the construction of a new, one-story, fully sprinkled, 11,500 square foot building located on the existing Deer Park Middle School campus. The scope will include all finishes, masonry, basic electrical services, roof system, mechanical, and sitework.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects