Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 19, 2023

March 20, 2023

June 27, 2025

To Be Determined

Demolition, New Construction, Remodeling, Site Work

No Information to Display

$8,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, San Luis Obispo, CA

Subscribe to View Full Documents

Cal Poly is requesting Statements of Qualifications (SOQ) from interested qualified Design-Build General Contractors to provide design, preconstruction and design-build construction services for the Water Infrastructure Improvement Project. The delivery method for this Project is Collaborative Design-Build. This is a two-phased project delivery: Phase 1-Design & Pre-construction Services to define the Project; and Phase 2-Design-Build Construction Services to complete the design and construct the Project. There will be separate agreements for each phase. The Design-Build General Contractor will be selected on qualifications and proposed fees (a design competition is not utilized). PROJECT BACKGROUND: The 2035 Master Plan accounts for nearly 15,000 beds of student housing to accommodate the first and second year live-on requirements as well as maintaining housing for transfer and returning upper division students. To begin to meet this need, the University intends to design and construct three new student housing projects at the current North Mountain and K-1 parking sites and renovate six existing residential halls at the current South Mountain site. The University's 2020 Utility Master Plan describes how the infrastructure needs to be improved, including the water system, to meet the 2035 Master Plan. Presently, the water system cannot accommodate the future Housing projects, and it needs to be improved to meet the new demands. PROPOSED PROJECT ELEMENTS: The project includes: Design and construction of two new water storage tanks (1.1 MG total) and associated piping above K-1 Parking Lot. Demolish existing Reservoir #2. Design and construction a new Pump House #2 to accommodate the new water storage tanks. Multiple pumps with VFD's are desired. Demolish existing Pump House #2. Relocation of existing water line connecting the new Pump House #2 and the new water storage tanks. Remodel Pump House #1 to improve efficiency. PROPOSED PROJECT DELIVERY METHOD: The delivery method for this project is Collaborative Design-Build. The project will fully embrace the principles of collaboration and integrated project delivery that emphasizes a cooperative approach to problem-solving. The University expects the Collaborative Design-Build team, as part of the project team, to deliver this project by creating a culture of open and honest communication, utilizing team principles efficiently and effectively, and establishing a collaborative environment where the project team contributes its best efforts for the benefit of the project as a whole. SELECTION PROCESS: The University will use a phased approach to select the collaborative design-build general contractor team: the builder will be selected with an RFQ/RFP process, and then the University will work collaboratively with the selected builder to select the design architect/engineer, and subsequently, all other team members. This process selects the Collaborative Design-Builder on qualifications and proposed fees (a design competition is not utilized). REQUIRED QUALIFICATIONS OF THE PROPOSER The Design-Build General Contractor is required to be licensed in the state of California with a 'A' license and registered to bid public works with the California Department of Industrial Relations (DIR). All Respondents must be prequalified with the CSU oneday prior to the SOQ due date or their SOQ submission may not be reviewed.Each Respondent's prequalification rating must be greater than the amount listed in the Project Budget Section of this RFQ. For informationregardingprequalification, go to website and click on the link for PlanetBids. Direct any prequalification questions to the Trustees' Prequalification Administrator at cocm.prequal@calstate.edu

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects