Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

March 29, 2024

951 S Jefferson St

Outdoor Lighting, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

951 S Jefferson St, Casper, WY

Subscribe to View Full Documents

A. Project Identification: BALLFIELD LIGHTING REPLACEMENT - PHASE III, PROJECT NO. 22-045 B. Project Summary The project includes the removal and replacement of the existing sports lighting and poles at the Washington Park Field. Drawings describing the detailed scope of work for the project are included in Section V. C. Location Washington Park, 951 South Jefferson Street, Casper, Wyoming 82601. D. Particular project requirements. 1. Apply for and obtain all permits required to perform the work. 2. Review all materials proposed for use in the project for asbestos content and potential hazards. See Section 01340 for submittal requirements. 3. Comply with applicable codes and regulations of authorities having jurisdiction and with requirements of the most recent edition of the City's Standard Specifications for Street Construction, Water Distribution Facilities, and Sewerage Collection Facilities Construction. 4. Field-verify dimensions indicated on drawings before fabricating or ordering materials. Do not scale drawings. 5. Notify Owner of existing conditions differing from those indicated on the drawings. Verify the existence and location of underground utilities along the route of proposed work. Omission from, or inclusion of, locations on the drawings, is not to be considered as the nonexistence of, or the definite location of, existing underground utilities. Do not remove or alter existing utilities without prior written approval. 6. The Contract Documents are intended to provide the basis for proper completion of the work suitable for the intended use of the Owner. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the project shall be included. The project includes the removal and replacement of the existing sports lighting and poles at the Washington Park Field. Site Directions: 951 South Jefferson Street Est. Completion Date: March 15, 2024

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.