Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2022

December 19, 2022

November 3, 2025

To Be Determined

Renovation

No Information to Display

$45,000,000.00

Public - City

img_map_placeholder

To Be Determined, Sunnyvale, CA

Subscribe to View Full Documents

**As of December 8, 2022, this project has not yet been awarded. Anticipated award date is on February of 2023. In accordance with Drawings and Specifications prepared by Carollo Engineers, the Work includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the Existing Plant Rehabilitation Project, Project No. UY-21-04. The Work includes but is not limited to: site work, installation of major process equipment, yard piping within the Water Pollution Control Plant boundaries, existing facility modification/demolition, electrical systems, instrumentation/control system improvements, and related systems and facilities. The Contract Time for the completion of all the Work of the Project is One Thousand Fifty (1,050) Calendar Days. Inquiries regarding further information about the Project may be directed to Lisa Vo, Principal Buyer, at LVo@sunnyvale.ca.gov (408) 730-7608. Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

58 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.