Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 23, 2023

August 30, 2024

OH-59

Paving, Site Work

No Information to Display

$3,336,900.00

Public - State/Provincial

img_map_placeholder

OH-59, Cuyahoga Falls, OH

Subscribe to View Full Documents

The surface tolerance specification requirements are modified to use the International Roughness Index (IRI) as follows for all pavements of constant width with at least 1 centerline mile (1.6 km) of continuous paving. Short breaks in paving such as bridge decks, intersections, etc. are not considered breaks in continuous paving. Also included is pavement for ramps, including acceleration lanes and deceleration lanes, where the total length is greater than 0.5 miles (0.8 km); and all interstateto-interstate ramps including acceleration lanes and deceleration lanes, regardless of total length. For roads with less than 1 centerline mile (1.6 km) of paving; ramps, acceleration lanes, and deceleration lanes not included above; and sections of undivided highways, as defined in this note, within corporation limits with posted speed limits less than 40 miles per hour, smoothness measurement and corrective action for all areas of localized roughness with an IRI in excess of 250 inches per mile (3.95 m/km) in 25 feet (7.6 m) is required. For these same areas, no corrective action for 0.1-mile (0.16 km) sections having an MRI (lot roughness) greater than 90 inches per mile (1.42 m/km) is required and no pay adjustments will be made. OHDOT - Four Lane Resurfacing - SR 59

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects