Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 16, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Saint Louis, MO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of August 3, 2023 a design team has been selected. Job No: J6I3534 & J6S3556 Location: J613534 - I-270/I-55 Interchange; I-270/I-44 Interchange; I-44 over the Meramec River. Project Involves Br. A-4811, A- 4882, A-5411, A-5412, A8231 and A-8683. J6S3556 - Marris road Over I-55, Geyer RoadOver I-44, Cragwold over I-270, I-270 over I-44 and bridge painting on the ramp from I-270 west to Route 67. Proposed Improvement: The Proposed Improvement of traffic control; bridge rehabilitation; bridge deck, and substructure repairs; expansion joint and bearing replacements; deck sealing; epoxy polymer overlays, steel girder blasting and recoating with System G; overcoating System G, and other misc. items of work Length: J613534 - 1.06 miles. J6S3556 - 0.36 miles. Approximate Construction Cost: $11.5 million DBE Goal (if applicable) 0% The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Traffic Control, Bridge Rehabilitation

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.